| Commercial
Contracts... |
 |
Winchester Cathedral
Inlay have recently completed 700 sqm of resin bound
surfacing at Winchester Cathedral.
The work included the macadam base course as well as an
18mm depth of resin bound surfacing in golden gravel.
More... |
|
Castle Bar School, Ealing
A dull depth construction was carried out during the
Easter holidays at Castle Bar School.
The work included excavation, drainage, macadam base
course and a finished surface of resin bound surfacing
with red walkways. |
|
St. Augustine Church, Penarth
Inlay Ltd were succesful in winning a contract to
overlay both new construction and the exsisting paths at
St. Augustine Church, Penarth. The contract had to be
sympathetically handled as the Church was still working
as normal throughout the paving works.
|
|
London Eye
A contract has recently been completed at the London
Eye. The Eye was closed in January with only a short
window to carry out the works. Despite snow and minus
temperatures, the job was completed 2 days ahead of
schedule. |
St Neots, Riverside
A new housing development at St Neots required over
1000 sqm of resin bound surfacing alongside the waters
edge. |
|
Recently completed
contracts include:
- Bristol Harbourside - 2250 m Clearmac
resin bound surfacing along the quayside for Ayton
Products
- Cambridge - over 3000 m of both resin
bound surfacing and hot lay clear macadam
- City of London Cemetery and Crematorium -
520 m of resin bound surfacing, including full depth
construction, blacktop, ducting and edgings
|
|
|
|
|
|
|